24 issues in water utilities
Wastewater Flows and Plant Capacity — Region II and Region V
October flows show remaining capacity at both county-run treatment plants in St. Michaels and Tilghman. Tilghman's system shows heavy rain-driven inflow and infiltration, and a study to reduce those peaks is planned. Members also noted the county doesn't closely track flows at plants run by Trappe, Easton, and Oxford.
Region II (St. Michaels) and Region V (Tilghman) wastewater and sewer improvements
The Tilghman-area plant is now estimated at $26 million — more than double the $12 million it was budgeted for — and staff will ask the County Council to adjust the capital budget.
Public Listening Sessions for Water and Sewer Plan
The first round of listening sessions on the water and sewer plan was lightly attended — partly because of scheduling right after Waterfowl and thin advertising. A second round is planned for late February or early March, ideally including an evening, countywide session.
Six-Tier Sewer Service Classification System
State law now requires every property to carry one of six sewer service classifications (S-1 through S-6), replacing the old three-tier system. The county's new water and sewer plan must adopt these tiers or the state won't accept it, and members worried about mapping complexity, legal challenges from property owners, and how to keep classifications from moving backward.
Goose Neck Road sewer service request
Twenty-one properties on Goose Neck Road in Royal Oak moved from 'Unprogrammed' to 'S-1' immediate priority in the water and sewer plan, clearing the way for sewer connections. One parcel with two houses gets two EDUs.
Knapps Narrows Dredging and Tar Island Jetty
Shoaling is choking the Knapps Narrows channel. The state approved a $100,000 waterway improvement grant, the county may seek a second $100,000 grant, and the Raymond family has offered Tar Island rent-free if the county builds a jetty to stop sediment migration.
Resolution 235 STEP Tank Connections
The STEP tank program is down to about 12 properties left with a 1% loan program helping homeowners; the Bozman/Neavitt force main is 90% done, and the county will push remaining residents to sign up before funding lapses next spring.
Biosolids facility equipment rebuild
Staff are building a rate model to see what borrowing would do to bills, noted the biosolids facility runs deeply in the red, and floated a $60/year septic pump-out fee idea. A 20-year loan retiring in 2027 frees up about $500,000 in debt service — but the county can't drop rates because new projects are coming.
Martingham vacuum sewer system rehab
Residents are petitioning to replace the aging Martingham vacuum sewer system, but the county warns they'll bear the cost themselves — likely through a loan — and crews currently work 24-72 hours straight every big rain keeping it running.
Knapps Narrows dredging
The state is bundling engineering and demolition work on the deteriorating pier, which lands only in Dorchester County. On the Talbot side, the old state park office would be torn down and replaced — and there may be a chance to win extra state dollars for a visitor experience.
Sewer connections funded by ARPA
About 60 homeowners have been hooked up to public sewer with federal pandemic money, and staff found that bidding individual home connections to local contractors is actually cheaper than big project contracts. The ARPA well is now dry, though demand keeps coming.
Region III wastewater treatment plant funding conditions
Cost estimates for upgrading the Region V WWTP have jumped to $26 million, requiring the county council to adjust the capital budget.
Claiborne Water and Sewer Project
The board reviewed a preliminary engineering report evaluating water and sewer extension options for Claiborne. Officials noted that drilling individual wells poses challenges due to lot sizes and setback requirements, while extending public sewer requires balancing high project costs with affordability for residents.
Wye Mills wastewater plant cost increase from state delays
The Board of Public Works just approved $875,000 in Bay Restoration Fund grant funding for the plant replacement, and a local contractor (Premier Service Group) is on the job. About 53 homes are connected, with room for more.
Connect Talbot Broadband Project Complete
Council members highlighted the county's broadband build-out as a key selling point — Talbot is on track to be the first fully funded (and served) county in Maryland, which they say now rivals quality of life as a draw for businesses.
Royal Oak sewer force main connection policy (Resolution 394)
A new resolution would let improved properties outside the Unionville, Tunis Mills and Copperville sewer area connect to the force main where public sewer is available, with conditions. It could untable four related sewer plan resolutions.
Resolution 175 Modification
The board debated and recommended changes to Resolution 175 to govern sewer connections outside designated service areas. The revisions allow connections where public sewer is available and adds forest conservation as a recognized environmental benefit.
Bushey Heath Road Water and Sewer Reclassification (Res. 392)
Two aging homes on one St. Michaels Road parcel now have S-1 sewer priority after the council fixed a drafting error to allow two EDUs. Approved on the spot.
Wastewater Treatment Capacity and Universal Policies
County officials are reviewing remaining wastewater treatment capacity for Region II, Region IV, and Region V facilities in connection with the Comprehensive Plan. Staff are considering developing a universal policy for sewer extensions to handle future lot connections.
Sewer service and existing housing
A resident asked whether existing failing septic systems would be prioritized over new development requests for sewer extensions; a workshop with the Public Works Advisory Board and County Council is pending.
Wastewater capacity and Tilghman Island plant sizing
The county has far more sewer capacity headroom than the state's allocation math suggests — roughly 1,700 extra hookups in Region 2 under county numbers versus 286 under the state's. Members questioned whether the planned Tilghman Island plant expansion is even needed, leaning toward smaller, phased 75,000-gallon modules that can grow later.
County $500,000 water and sewer extension request
The county's ask for $500,000 to extend water and sewer service for the short regional medical center has been confirmed by Senate budget leadership and is expected in the capital budget moving this week.
HVAC replacement at Roads/EOC building
The county maintains 327 miles of roads, prioritizing main thoroughfares like Cordova Road and airport-area routes. New equipment — excavator, dump truck, loader, trailer, message sign — keeps the crew productive, and in-house CDL training saves $10,000.
MDE and Rural Development grant and loan applications
The county is asking the council to let it apply for roughly $40 million in grants and loans — headlined by $20 million for the Tilghman wastewater plant upgrade and $6 million for Tilghman sewer collection improvements. Applications are due to MDE by January 30.