Thomas S. Gordon III
No biography on file yet.
Voice
- Meetings spoken in
- 57
- Total speaking time
- 7:01:46
- Avg per meeting
- 7:24
- Segments
- 5472
Want every word Gordon has said?
The OpenCity MCP for Claude.ai answers questions like “what has Gordon said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (20)(Roads)
Davis Road safety, width, and school bus access
Testimony suggested emergency response times could degrade and road maintenance costs could rise under heavy commercial traffic.
Snow Removal Services for the 2026-27 Winter
Up to $566,000 from the FY27 adopted budget.
Old Baltimore Road closure and Chick-fil-A traffic
The county is paying 90% of the Market Street Extended road cost, with the Chick-fil-A developer paying 10% — a split Commissioner Kiler wants revisited.
Route 26 corridor neglect and traffic safety
A ~$150,000 Reidenauer road alignment study is underway; billions in state funds have been missed historically.
Traffic safety on Route 27 near Westview Road
The county is committing its own funding for engineering studies after years of letters to SHA with little effect.
Bridge Repair Services
Estimated $128,271 county share of $641,356 in design costs, 80% federally aided.
TrailBlazer Transit Route Changes
Federal grant funding has been flat for ten years while operating costs rise.
Storm Drain Failure at Old Westminster Pike and Monarch Meadow
$66,150 from the FY27 adopted budget.
Eldersburg road right-of-way acquisition
$11.2 million combined in the FY27 capital plan.
Freedom-area roadway planning study
$172,185 total, $48,000 covered by a federal-planning grant.
Road repair asphalt purchases
Up to $419,000 in FY27 road materials spending.
Reidenour Way planned major street
A $590,000 county purchase from the FY27 budget.
Traffic and road safety on Long Meadow Drive
Traffic mitigation for the broader Beatty property is required with the corporate park phase, but no signal at Long Meadow/Route 26 was offered.
FY28-33 capital projects and Freedom-area traffic
Unknown pending SHA breakout numbers; commissioners discussed reallocating existing road allocations rather than adding funds.
Market Street Extended Project
FY 2027 state transportation priorities
State funding for corridor design and construction is uncertain; county matching funds proposed for MD 26 segments in the next CIP.
Countywide road paving and preservation program
About $320,000 total across the three purchases, all within the approved FY26 budget.
Five-year transit plan
Transit operating costs are projected to rise from about $3.4 million to nearly $5 million a year by 2031.
Three-way stop safety at Liberty Road and Exchange Drive
Potential costs for rumble strips, signage, or signal upgrades would fall on the county, the state, or the private road owner depending on jurisdiction.
Eldersburg road connectivity and gated developments
The county would need to bring capital dollars to complete the Georgetown Boulevard connection.
Decisions during term (1)
Recorded while III was in office — not necessarily decisions they moved, spoke to, or voted on.
Voting record (0)(Roads)
No votes found matching Roads.