PLM

Patrick L. McGrady

Mayor2023-11-27–2027-11-01 (month-level end: November 2027 because the 2023 election gave four-year terms per the Bel Air Aberdeen elections certified report and the 2025 city election page shows four-year council terms; start is the Nov 27 2023 swearing-in reported by the same article)

No biography on file yet.

At a glance

News mentions
0

Term ending Nov 1, 2027.

Voice

Meetings spoken in
38
Total speaking time
20:32:14
Avg per meeting
32:26
Segments
17306

Want every word McGrady has said?

The OpenCity MCP for Claude.ai answers questions like “what has McGrady said about housing this year” with one prompt — full speaking history, with YouTube timestamps.

Filtered to Roads

Top issues during term (14)(Roads)

medium↑Nov 2026[20]

Sunnyside Drive Project

No city cost identified; the HOA will own and maintain the private drive and utilities.

medium↑Nov 2026[10]

Brentwood Square alley takeover and paving

Paving cost to the city not yet stated; homeowners could buy in at contractor rates.

high↓Jan 2026[10]

Route 40 pedestrian safety

Related federal grants include $4.8 million for Station Square design; no direct cost to residents was stated for the Route 40 study.

medium↓Apr 2026[6]

TOD Station Square pedestrian underpass

Cost varies significantly by option, with the undergrade bridge the most expensive alternative.

high↓Jun 2026[6]

The Reserve at Greenside transportation fees

Up to roughly $882,000 into a regional transportation fund as homes are permitted.

high↓Apr 2026[6]

Middleton Road pedestrian safety / crosswalk request

Highway user revenue funds limit the city to roughly two sidewalk projects a year; more funding could clear the backlog faster.

medium↓Oct 2026[5]

Fields of Aberdeen roundabout redesign

low↓Sep 2026[5]

APG Middle Gate Status

Gate improvements are on hold; no new city spending identified.

high↓Mar 2026[4]

$2M street resurfacing and sidewalk contract

Potential $150,000 allocation from Highway User Revenue (~$1.2-1.7M/year).

high↓Jun 2026[2]

Traffic, site access, and emergency access on West Bel Air Avenue

Planned improvements include a westbound left-turn lane, pedestrian refuge median, bike lane, and a possible pedestrian-activated flashing beacon, with funding responsibility between the city and SHA not yet settled.

high↓May 2026[2]

Additional $1 million infrastructure funding

$1 million drawn from the city's fund balance.

high↓Mar 2026[1]

Traffic impact assessment framework

Developers near problem intersections could face costs for traffic studies and mitigation; city costs would come from administering reviews.

low↓Mar 2026[1]

Weekend shuttle connecting stadium, downtown, and hotels

Unfunded concept; operating costs unknown and would likely require budget or grant support.

high↓Mar 2026[1]

Crossing guard procedures at local schools

Could shift traffic mitigation costs to developers; funding mechanisms are still undecided.

Decisions during term (0)

Recorded while McGrady was in office — not necessarily decisions they moved, spoke to, or voted on.

No decisions found matching Roads.

Voting record (0)(Roads)

No votes found matching Roads.