Stormwater Payment-in-Lieu
Right now developers can't pay the city to handle their stormwater off-site — some, like the AMI project at Barnett and Beards Hill, are stuck paying huge on-site costs. Council wants an ordinance creating a credit-based payment tool, priced above the city's own cost to earn credits.
Swan Meadows Water and Sewer Replacement
Councilwoman Ridgley announced $2 million in federal funding, secured through Congressman Andy Harris's office, for water and sewer infrastructure in the Swan Meadows community.
Swan Meadows project presence and neighborhood revitalization
The city asked for $5 million to replace aging Aberdeen Volunteer Fire Department apparatus and $6 million for Swan Meadows water and sewer infrastructure, with support from Congressman Harris and the state's senators.
Aberdeen Hills Water Project and Infrastructure Updates
Residents say new water infrastructure sent pressure up to roughly 130 psi, bursting water heaters and flooding homes. The city has reportedly denied responsibility, and residents are asking for reimbursement and better notice about pressure-reducing valves.
Aberdeen Hills waterline replacement — final phase
A resident voiced frustration with years of delays on water line improvements and other projects, asking for better coordination and a meeting with the mayor to restore public confidence.
Long-term water supply planning
Aberdeen relies on Harford County water, the Aberdeen-Havre de Grace pipeline, and wells, and leaders worry about rising costs and aquifer limits. The council approved a $34,500 study of groundwater options, one of three paths including Baltimore's 'Big Inch' pipeline and a surface water plant near Oakington.
Havre de Grace Water Rate Increase
Havre de Grace jacked up the wholesale water price by about 40%, costing Aberdeen roughly $378,000. To break even, water rates go up 12.9% and sewer 2.5% — about 7% on the average total bill. The city plans to stick to the minimum 500,000 gallons/day purchase and lean on its own wells.
South Drive sewer interceptor replacement
An undersized 8-inch sewer line near South Drive, Webb Street, and Clayton Street will be replaced with bigger pipe to stop sewage overflows. The Mayor clarified it won't fix the stormwater flooding on Edmund Street.
Wastewater plant clarifier rehabilitation
The second of two primary clarifiers built in the early 1970s is getting a $378,600 rebuild — replacing rotted concrete and a corroded steel platform to keep the plant running safely.
Utility Rates and APG Contract
Mayor McGrady proposed a 2.5% water/sewer rate increase and rejected 5-7% annual increases, arguing operations are cash-flow positive with large reserves. The 1997 APG privatization agreement pays the city cost-plus; officials will verify utility pole billing.
Rising BGE Electric Bills
Council members flagged skyrocketing BGE bills and reminded residents that BGE offers a free in-home energy checkup that can install LED bulbs, insulation, smart thermostats and more at no cost.
$2 million federal earmark for Swan Meadows infrastructure
The mayor and planning director went to Washington to press for $6 million more for the Swan Meadows water and sewer line project and funding to replace three fire apparatus pieces more than 25 years old. They already secured $2 million for Swan Meadows and $300,000 for the Activity Center; a decision is expected by March 2027.